Laserfiche WebLink
Mr. Steve M. Ferrara -2- <br /> Additional Site Assessment Work Plan <br /> 1. Procedures for decontamination of the core sampler were not specified in <br /> the work plan. These procedures should be stated to ensure that they <br /> are acceptable to the Board and are adequate to prevent cross- <br /> contamination. <br /> 2. Duplicate samples should be taken to check the accuracy of sampling and <br /> testing procedures. <br /> Based on the foregoing, by 18 December 1992, we request that you address our <br /> comments on the additional site assessment work plan and submit a revised <br /> schedule for completing the work. By 30 December 1992, please submit a work <br /> plan for investigating the potential impact of the facility' s operations on <br /> the second water bearing zone. <br /> Please call me at (916) 255-3049 if you have any questions. <br /> PHILIP S. ISORENA <br /> Associate Engineer <br /> PSI : <br /> cc: Ms. Margaret Lagorio, San Joaquin County Public Health Services, <br /> Stockton <br /> Mr. James Holland, Santa Fe Pacific Pipeline Partners, L. P. , <br /> Los Angeles <br /> I <br /> i <br />