My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1999-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2900 - Site Mitigation Program
>
PR0009241
>
FIELD DOCUMENTS_1999-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 1:42:56 PM
Creation date
3/30/2020 1:24:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1999-2014
RECORD_ID
PR0009241
PE
2960
FACILITY_ID
FA0004015
FACILITY_NAME
SHELL OIL (STOCKTON PLANT)
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203002
CURRENT_STATUS
01
SITE_LOCATION
3515 NAVY DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sent By: aToxichem Management SystemsnC;650 551 0116; Aug-29-00 :16PM; Page 1 /2 <br /> California Regional Water Quality Control Board <br /> `■/ Central Valley Region o .f <br /> Steven T.Butler,Chair <br /> Winston H-Htckox Gov Davis <br /> Secrelaryfor Sacramento Main Office Governer <br /> Snvimnmenlal lntemat Addmss: http:/Iw .4-rcb.ca.gov/—wqcb5 <br /> Pralectiun 3449 Rouder Road,Suite A,Sacramento,Culirumia 95827-3003 <br /> Phonc(916)255-3000•FAX(916)255-3015 <br /> 15 August 2000 <br /> Mr. Jeff Goold <br /> Equiva Services LLC <br /> 10602 NE 38"Place <br /> Kirkland, WA 98083 <br /> WORK PLAN APPROVAL,F,QUILON BULK FUEL FACILITY,STOCKTON, SAN JOAQUIN <br /> COUNTY <br /> I have reviewed Toxichem Management Systems, Inc.'s 14 July 2000 Site Investigation Work Plan for <br /> the Equilon Bulk Fuel Facility at 3515 Navy Drive in Stockton. The work plant proposes to drill two <br /> borings east of monitoring wells (MWs) 11 and 17 next to the eastern perimeter fence of the facility. <br /> Specifically,the work plan recommends to do the following: ('1) Install the two borings described above, <br /> (2) Collect soil samples for logging and possible chemical analysis every five feet or less, (3) Submit <br /> two soil samples per boring for laboratory analysis, (4) Install a 4-inch groundwater MW in each boring, <br /> and (5)Develop and survey the MWs and incorporate them into the monitoring program. <br /> My comments on the work plan are presented below. <br /> 1. The work plan should specify that the soil samples are going to be analyzed for total petroleum t <br /> hydrocarbons as diesel and gasoline; benzene,toluene, ethylbetlzene and xylenes; and oxygenates <br /> including methyl tertiary butyl ether. <br /> 2. If the MWs are completed within a month of the regular quarterly sampling event, then Equilon may <br /> sample the newly-installed MWs during the quarterly sampling event. If not, Equilon should sample <br /> the MWs within a week of completion. <br /> The work plan is hereby approved provided the above comments are incorporated. By 29 August 2000, <br /> please submit a schedule to: (1) Implement the work plan and (2) Submit the investigation report. The <br /> investigation report should be prepared in general accordance with Attachment 1, Items 7'0 Be Included <br /> In A Site Assessment Report. <br /> California Environmental Protection Agency <br /> 0 R,,,ycicd Pnper <br />
The URL can be used to link to this page
Your browser does not support the video tag.