My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_1999-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2900 - Site Mitigation Program
>
PR0009241
>
FIELD DOCUMENTS_1999-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 1:42:56 PM
Creation date
3/30/2020 1:24:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
1999-2014
RECORD_ID
PR0009241
PE
2960
FACILITY_ID
FA0004015
FACILITY_NAME
SHELL OIL (STOCKTON PLANT)
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203002
CURRENT_STATUS
01
SITE_LOCATION
3515 NAVY DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TOX�CHENf Industrial Hygiene-Exposure Assessment <br /> Quantitative Risk Assessment <br /> Management -,n Compliance Ardits <br /> -U�C`/J \ Real Property Environmental Assessments <br /> Systems, Inc. j c/temedial Investigations <br /> Environmental&Occupational Health Services �iF�d So/Ind Groundwater Sampling <br /> 11 Kenton Avenue Reme8i91 Engineering and Construction <br /> 1 San Carlos, California 94070 Regulatory Compliance and Negotiation <br /> (650) 551-0112/Fax(650)551-0116 Litigation Support Services <br /> August 30, 2000 <br /> Project EQ-14.1A <br /> Mr. Philip Isorena <br /> California Regional Water Quality Control Board- <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3003 <br /> Re: Site Investigation Work Plan and Revised SVE Start-Up Schedule <br /> Equilon Bulk Fuel Facility—Stockton Plant <br /> 3515 Navy Drive, Stockton, California <br /> Dear Mr. Isorena: <br /> Thank you for your August 15, 2000 comments on the Site Investigation Work Plan (Toxichem <br /> Management Systems, Inc, dated July 14, 2000). The soil boring advancement and groundwater <br /> monitoring well installation is scheduled to be completed on September 28, 2000. Your comments will <br /> be incorporated and the report will be prepared in accordance with Attachment 1 of your letter,Items to <br /> be Included in a Site Assessment Report. It is anticipated that the report will then be submitted six weeks <br /> upon field work completion(November 13, 2000). <br /> In addition, in your letter dated June 8, 2000,you requested that the soil vapor extraction system be <br /> restarted and that Well MW-13 be connected to the groundwater extraction system. A start-up schedule <br /> for the SVE and hooking up Well MW-13 to the GWE was proposed for August 30, 2000. Due <br /> maintenance issues relating to the existing ThermTech VAC25, it was decided to substitute an alternative <br /> SVE unit(a VR Systems, V-3). The unit will be installed complete with propane by August 30, 2000, <br /> although will not be started up due to the San Joaquin Valley Air Air Pollution Control District requiring <br /> a new permit rather than a modification of the old. The permit is currently being reviewed by the air <br /> district. Start-up is anticipated within three weeks upon acquiring the permit. <br /> The pneumatic pump, controller and totalizer has been installed on Well MW-13 and groundwater <br /> extraction will be implemented beginning on August 31, 2000. <br /> If you have any questions please feel free to contact me at your convenience at(650) 551-0112. <br /> Sincerely, <br /> Toxi ern management Systems,Inc. <br /> L-� <br /> Ross Tinline, R.G. <br /> Senior Geologist <br />
The URL can be used to link to this page
Your browser does not support the video tag.