Laserfiche WebLink
discontinue pumping have been denied, so extracting groundwater in this manner will <br /> continue until the AS/SVE system installation work begins. <br /> 4.0 PROPOSED ACTIVITIES <br /> 4.1 GROUNDWATER MONITORING <br /> Blaine will gauge and sample the wells quarterly, and CRA will issue semiannual <br /> groundwater monitoring and remediation reports,according to the MRP for this site. <br /> 4.2 REMEDIATION <br /> CRA will continue to operate the GWE system. <br /> CRA will proceed with the proposed AS and SVE well installations and will continue <br /> working on the AS/SVE system design and permitting. <br /> 241729(28) 8 CONESTOGA-ROVERS&ASSOCIATES <br />