My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_GROUNDWATER MONITORING AND REMEDIATION REPORT - 3RD AND 4TH QUARTERS 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2900 - Site Mitigation Program
>
PR0009241
>
ARCHIVED REPORTS_GROUNDWATER MONITORING AND REMEDIATION REPORT - 3RD AND 4TH QUARTERS 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 2:10:34 PM
Creation date
3/30/2020 1:50:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
GROUNDWATER MONITORING AND REMEDIATION REPORT - 3RD AND 4TH QUARTERS 2010
RECORD_ID
PR0009241
PE
2960
FACILITY_ID
FA0004015
FACILITY_NAME
SHELL OIL (STOCKTON PLANT)
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203002
CURRENT_STATUS
01
SITE_LOCATION
3515 NAVY DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRA prepared a vicinity map (Figure 1) and groundwater contour and chemical <br /> concentration maps (Figures 2 and 3). CRA presents the sampling schedule and specific <br /> analyses in Table 1 and the well construction details in Table 2. Blaine's report, <br /> presenting the analytical data,is included in Appendix A. <br /> 2.2 REMEDIATION <br /> 2.2.1 GROUNDWATER EXTRACTION (GWE) SYSTEM OPERATION <br /> The temporary GWE system began operating on April 10, 2006. The GWE system <br /> pumps groundwater from well MW-1 using a top-loading submersible pneumatic <br /> pump. Groundwater is stored in an on-site baker tank, and vacuum trucks transport the <br /> water to Shell's Martinez Refinery for recycling. Mass removal and groundwater <br /> analytical data are presented in Table 3. Note that this table includes cumulative <br /> volume and petroleum mass removed from prior pumping operations. <br /> 2.2.2 AIR SPARGE (AS) AND SOIL VAPOR EXTRACTION (SVE) <br /> IMPLEMENTATION <br /> On July 1, 2010, CRA provided clarifications to our May 7, 2010 Air Sparge Well and Soil <br /> Vapor Extraction Well Installation Work Plan, as requested in the RWQCB's June 16, 2010 <br /> letter. Shell received RWQCB's August 17, 2010 letter, which comments on CRA's work <br /> plan clarifications and the first and second quarter 2010 groundwater monitoring report. <br /> CRA is resolving access issues prior to proceeding with AS well installations. We expect <br /> to complete the well installations during the first quarter 2011. We are also working on <br /> the AS/SVE system design and permitting. <br /> 3.0 CURRENT FINDINGS <br /> The monitoring data discussed include groundwater elevations and flow directions, <br /> vertical gradients, separate-phase hydrocarbons (SPHs), isoconcentration maps, and <br /> petroleum constituent concentrations and plume trends. The remedial system data <br /> discussed include system performance,operation, and effectiveness. <br /> 247729(28) 2 CONESTOGA-ROVERS&AssocIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.