My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_GROUNDWATER MONITORING AND REMEDIATION REPORT - 3RD AND 4TH QUARTERS 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
3515
>
2900 - Site Mitigation Program
>
PR0009241
>
ARCHIVED REPORTS_GROUNDWATER MONITORING AND REMEDIATION REPORT - 3RD AND 4TH QUARTERS 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 2:10:42 PM
Creation date
3/30/2020 1:53:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
GROUNDWATER MONITORING AND REMEDIATION REPORT - 3RD AND 4TH QUARTERS 2011
RECORD_ID
PR0009241
PE
2960
FACILITY_ID
FA0004015
FACILITY_NAME
SHELL OIL (STOCKTON PLANT)
STREET_NUMBER
3515
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16203002
CURRENT_STATUS
01
SITE_LOCATION
3515 NAVY DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.6 GWE SYSTEM PERFORMANCE <br /> Based on the groundwater analytical data collected from well MW-1, the GWE system <br /> removed approximately 1.1 pounds TPHg, 0.1 pounds benzene, and 1.5 pounds MTBE <br /> during the second half of 2011. <br /> As of December 28, 2011, approximately 11,575,013 gallons of groundwater have been <br /> extracted (Table 4). During the second half of 2011, approximately 12,611 gallons of <br /> groundwater were treated. The GWE system flow rates averaged 0.04 gallons per <br /> minute. <br /> 3.6.1 OPERATIONAL ISSUES <br /> None. <br /> 3.6.2 SYSTEM EFFECTIVENESS <br /> As discussed in previous reports, the relatively stable MTBE concentrations since <br /> August 2006 suggest that pumping from well MW-1 is ineffective. In our <br /> November 30, 2011 letter, CRA recommended shutting down this system. <br /> 4.0 PROPOSED ACTIVITIES <br /> 4.1 GROUNDWATER MONITORING <br /> Blaine will gauge and sample the wells quarterly, and CRA will issue semiannual <br /> groundwater monitoring and remediation reports, according to the MRP for this site. <br /> 4.2 REMEDIATION <br /> As requested in the Central Valley Water Board's January 13, 2012 letter, CRA will <br /> submit a corrective action plan by February 15, 2012. <br /> As discussed above, CRA recommends shutting down the temporary GWE system and <br /> will do so upon receiving approval from the Central Valley Water Board. <br /> 241729(32) 7 CONESTOGA-ROVERS&ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.