My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2900 - Site Mitigation Program
>
PR0504875
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:14 PM
Creation date
3/30/2020 2:12:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0504875
PE
2951
FACILITY_ID
FA0006377
FACILITY_NAME
CHEVRON PRODUCTS CO (INACT)
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
02
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t ` j <br /> c <br /> ' � M <br /> Chevron Products Company 3 <br /> Chevron Clation;:9_2396 25650 I Iia hwaN 99 Noilh. caattx).Calilbmia Iyovemlwr 21.2000 <br /> • Report. A report will be prepared after completion of necessary <br /> fieldwork and upon receipt of laboratory analytical results. The <br /> report will include boring logs, a site map, analytical results, chain- <br /> of-custody documentation, and findings. <br /> Proposed field and laboratory procedures are presented as Attachment A. <br /> SCHEDULE <br /> SECOR is prepared to initiate field work coordination immediately following approval <br /> of this work plan by the San Joaquin County Environmental Health Division and the <br /> securing of the appropriate permits from San Joaquin County. A report documenting <br /> the findings is anticipated to be submitted approximately 8 to 10 weeks after the <br /> completion of field work. <br /> If there are any questions regarding the contents of this work plan, please tali us at <br /> (916) 861-0400. <br /> Sincerely, <br /> SECOR International Incorporated <br /> Ronald D. Chinn, P.E. <br /> Project Engineer <br /> Roger Hoffmore <br /> Project Manager <br /> Attachments: Figure I - Site Location Map <br /> Figure 2 - Site Map <br /> Attachment A - Field And Laboratory Procedures <br /> cc: Bob Cochran, Chevron Products Company, San Ramon, CA <br /> Marty Hartzell, RWQCB-Central Valley Region, Sacramento, CA <br /> I:\Chrvrom92396•-Repons`.WiI soil horings&domestic\%ell s:onple.dor <br />
The URL can be used to link to this page
Your browser does not support the video tag.