My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005555
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2900 - Site Mitigation Program
>
PR0504875
>
ARCHIVED REPORTS_XR0005555
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:29 PM
Creation date
3/30/2020 2:23:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005555
RECORD_ID
PR0504875
PE
2951
FACILITY_ID
FA0006377
FACILITY_NAME
CHEVRON PRODUCTS CO (INACT)
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
02
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD OPERATING PROCEDURE - <br /> GROUNDWATER SAMPLING <br /> Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection,the type of <br /> analysis to be performed is determined Loss prevention of volatile compounds is controlled and sample <br /> preservation for subsequent analysis is maintained <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe Product thickness, if present, is measured to the nearest 0 01 foot and is noted in the field notes <br /> In addition, all depth to water level measurements are collected with a static water level indicator and are <br /> also recorded in the field notes, prior to purging and sampling any wells <br /> After water levels are collected and prior to sampling, each well is purged a minimum of three well <br /> casing volumes of water using pre-cleaned pumps (stack, suction, Grundfos), or disposable bailers <br /> Temperature,pH and electrical conductivity are measured a minimum of three times during the purging <br /> Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved containers,supplied by analytical laboratories,are used <br /> when possible When pre-preserved containers are not available,the laboratory is instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to include the job number, sample <br /> identification,collection date and time, analysis,preservation (if any), and the sample collector's initials. <br /> The water samples are placed in a cooler, maintained at 4oC for transport to the laboratory Once <br /> collected in the field,all samples are maintained under chain of custody until delivered to the laboratory <br /> The chain of custody document includes thejob number,type of preservation,if any, analysis requested, <br /> sample Identxficatlon, date and time collected, and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br /> A laboratory supplied trip blank accompanies each sampling set For sampling sets greater than 20 <br /> samples,5% trip blanks are included The trip blank is analyzed for some or all of the same compounds <br /> as the groundwater samples <br /> As requested by Chevron Products Company, the purge water and decontarmnation water generated <br /> during sampling activities is transported by IWM to MCKlttrlck Waste Management located in <br /> McKittrick, California <br /> N 1CahfomiaVc n s chevron-S0P 1 1-1 1-02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.