My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
0
>
2900 - Site Mitigation Program
>
PR0506239
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:10 PM
Creation date
3/30/2020 4:54:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506239
PE
2950
FACILITY_ID
FA0007296
FACILITY_NAME
CITY OF ESCALON
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
HWY 120
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN- 5-96 WED 14:05 KLEINFELDER FAX H0. 2099480621 P. 02/02 <br /> U <br /> KLEINFELDER <br /> AnC—pr"'""+ 11 tnmvanr <br /> File No.20-3941-01<E01 <br /> June 5, 1996 <br /> Mr. Steve Sasson <br /> San Joaquin County <br /> Public Health Services Department <br /> Environmental Health Division. <br /> P.O. Box 388 <br /> Stockon, California 95201-0388 <br /> RE: Pre-Construction Hazardous Materials Investigation <br /> Hwy 120/McHenry Avenue Project <br /> Escalon,California <br /> 13c'm stGyG. <br /> In accordance with our telephone conversation of friday altetnoon,Klein€elder will grout <br /> all of the soil borings outlined in our April 16, 1996 workplan for the above-refereaced <br /> site. The borings would be grouted with either a neat cement or a send/cement slurry., <br /> Where appropriate,the upper 1 -2 feet of each boring may be backfilled with either cold- <br /> patch asphalt or concrete to match surface conditions. <br /> Currently,we plan on starting the drilling on Tuesday June 18, 1996: Please let me know <br /> if there are any fwffier questions,or problems. <br /> Respectfully submitted, <br /> KLEINFELDER, INC <br /> Robert"Tony' Martin, R.E.A. <br /> Senior Geologist <br /> cc: 11om Clark,City of Escalon <br /> Marvin Miller,Nolte <br /> KICINFELC7L-R 2825 E1st Myrtle Street,Stockton,CA 95205-4794 (209)940-1345 <br />
The URL can be used to link to this page
Your browser does not support the video tag.