Laserfiche WebLink
r • <br /> KLEiNFELDER <br /> File No. 20-3941-O1.E01 <br /> April 11, 1996 <br /> Task E02-Drilling of Twenty-Sig(26) Soil Borings <br /> Twenty-three (23) soil borings will be advanced to a minimum depth of 10-feet below surface grade <br /> (bsg). Additionally, three (3) more borings would be advanced to a minimum depth''of 25 feet bsg. <br /> The 23 borings will be located as follows: <br /> 1. Pacoast Chemical <br /> 1436 1st Street(at McHenry Avenue) <br /> APN 247-140-29 <br /> (1 boring on the western shoulder of McHenry Avenue(city encroachment area) within a <br /> future curb and gutter area) <br /> 2. Tom Hillier Ford <br /> 3000 McHenry Avenue <br /> APN 247-15042 <br /> (2 borings within thes current shoulder of McHenry Avenue in an area which will later be <br /> sidewalk and cur/gutter area for Hwy. 120) <br /> 3. Chevrolet Dealership <br /> 3000 Block ofMcHenry Avenue <br /> APN 247-150-40 <br /> (2 borings within the current shoulder of McHenry Avenue in an area which will later be <br /> sidewalk and cur/gutter area for Hwy. 120) f <br /> 4. Former Pacific Gas&Electric Substation <br /> McHenry Avenue <br /> APN 225-110-18 <br /> (both of the 2 borings would be located near the western property line) <br /> 5. Malt's Texaco Station <br /> SEC First/McHenry Avenues <br /> APN 227-090-01 <br /> (all three of the borings would be located near the western property line) <br /> 6. Wright's Petroleum Bulk Plant(Chevron) <br /> 1502 Weiss Way <br /> APN 227-084-01 <br /> (both of the borings would be located near the western property line) <br /> 20-3941-O1.E01/10960042 Page No.. 6 of 12 Copyright 1996.Kleinjelder,Inc. <br />