Laserfiche WebLink
16"1'0 "95 MON 11: 07 FAX 15109"9968 ERMIVEST W(' <br /> HEALTH AND SAFETY PLAN <br /> for Soil Sampling Activities at <br /> Sears Automotive Centex, 5110 Pacific Ave., Stockton, CA <br /> It is the responsibility of the project manager to enforce health and safety <br /> procedures at the site. All project personnel must receive a copy of this plan <br /> and sign the form indicating acceptance. A , <br /> 1. Site Location <br /> This Health and Safety Plan (HSP) has been prepared for the Sears <br /> Automotive Center Facility located 5110 Pacific Ave., Stockton, CA. "Site" <br /> in this Health and Safety pian refers to the facility identified above. <br /> 2. Key ERM Personnel <br /> Project Manager Jim Quinn <br /> Project Geologist/Engineer Jon Vail <br /> Site Safety Officer Ton Vail <br /> Director of Health and Safety Steven Meyers, CI1-I <br /> 3. Site Description and Background <br /> This Health and Safety Plan has been written to address the health and <br /> safety provisions that will be instituted during soil sampling activities at <br /> the site. The site consists of the former location of underground storage <br /> tanks that contained gasoline. Borings will be installed in the areas where <br /> the underground storage tanks were formerly located. <br /> 4. Hazards of Known or Expected Chemicals of Concern <br /> Total and isotopic lead will be analyzed for in soil samples collected during <br /> the field work. These compounds were detected in soil samples collected <br /> in previous work. <br />