Laserfiche WebLink
Health and Safety Plan 8 <br /> Sears,5110 Pacific Avenue, Stockton, California October 22, 1999 <br /> Table 2 Potential Hazards and Control (continued) <br /> ' Potential Hazard Control <br /> Fire Control 1 Smoke only in designated areas <br /> ' 2 Keep flammable liquids in closed containers <br /> 3 Keep site clean, avoid accumulating combustible debris such as <br /> paper <br /> ' 4 Follow Hot Work Safety Procedures when welding or performing <br /> other activities requiring an open flame <br /> 5 Isolate flammable and combustible materials from ignition sources <br /> 6 Ensure fire safety integrity of equipment installations according to <br /> ' Hazard Classification Diagram (Appendix G) <br /> Static Electricity 1 Do not create static discharge in flammable atmospheres <br /> 2 Electrically bond and ground pumps transfer vessels, tanks, drums, <br /> ' bailers and probes, when moving liquids <br /> 3 Electrically bond and ground vacuum trucks and the tanks they are <br /> emptying <br /> ' 4 Do not splash fill containers with flammable liquids <br /> Drilling/Boring 1 Driller and helper must be present during all active operations <br /> Operations 2 Driller helper and other site personnel must know location of <br /> emergency shut off switch <br /> 3 Unauthorized personnel must be kept clear of drilling rig <br /> 4 Area of drilling operation must be cordoned off/barricaded <br /> ' 5 When hazardous conditions are deemed present, operation must be <br /> shut down <br /> Well Installation, 1 Wear appropriate PPE to avoid skin, eye, and inhalation contact <br /> ' Well with contaminated groundwater and/or soil <br /> Development, 2 Stand upwind when conducting tasks and minimize possible <br /> Well Gauging, inhalation exposure, especially when first opening monitoring <br /> ' Well Sailing, wells <br /> Soil/Ground- 3 Conduct air monitoring to determine level of respiratory protection <br /> water Sampling 4 Utilize engineering controls such as portable venturi air movers to <br /> draw away or blow away chemical vapors <br /> Welding, 1 Conduct fire safety evaluation <br /> Cutting, Brazing 2 Complete Hot Work Permit (Appendix E) <br /> 3 Follow lob safety analysis (JSA) guidelines for hot work in <br /> Appendix E- <br /> 3 <br /> 3 Ensure flammable materials are protected from hot work, sources <br /> of ignition <br /> ' 4 Ensure fire watch/fire extinguisher is on standby by hot work <br /> location <br /> 1 <br />