Laserfiche WebLink
Health and Safety Plan 13 <br /> Sears,5110 Pacific Avenue, Stockton, California October 22, 1999 <br /> 1 Table 4 Air Monitoring Summar <br /> Job Task . F Level PPE Instrument Fre aeric <br /> Drilling/Boring/Soil Level D or PID' or FID 2, Start up of work, then <br /> Sampling Modified Level D 02/LEL3, or 30 minutes to continuously <br />' DT <br /> Well Installation Level D or PID or FID, Start up of work at each new <br />' Modified Level D 02/LEL, or task location <br /> DT <br /> Well Monitoring and Level D or PID or FID, Start up of work at each new <br />' Maintenance Modified Level D 02/LEL, or task location <br /> DT <br /> Soil Gas Survey Level D or PID or FID, Start up of work at each new <br />' Modified Level D 02/LEL, or task location <br /> DT <br />' Aquifer Pump Test Level D or PID or FID, Start up of work at each new <br /> Modified Level D 02/LEL, or task location <br /> DT <br /> Tank Removal Level D or PID or FID, Start up of work at each new <br /> Modified Level D 02/LEL, or task location <br /> DT <br /> Excavation/Trenching Level D or PID or FID, Start up of work at each new <br /> Modified Level D 02/LEL, or task location <br /> DT <br /> Groundwater Level D or PID or FID, Start up of work at each new <br /> Sampling Modified Level D 02/LEL, or task location <br /> DT <br /> PID, Photoion+zation Detector <br /> 2 FID, Flame Ionization Detector <br /> 3 02/LEL, Oxygen Level and Combustible Gas Meter <br /> ° DT, Benzene Detector Tube <br /> Note "Start up of work at each new task location" means to monitor the air quality at <br /> e each new operation on the site The breathing zone is the area inside a 1-foot radius <br /> around the nead <br /> • <br />