Laserfiche WebLink
Health and Safety Pian i8 <br /> Sears,5110 Pacific Avenue, Stockton, California October 22, 1999 <br /> 43 Site Control Work Zones <br />' Work zones will be established in order to (1) delineate high-traffic locations, (2) identify <br /> hazardous locations, and {3} contain contamination within the smallest area possible Employees <br /> entering the work zone must wear the proper PPE for that area Work and support areas will be <br /> ' established based on ambient air data, necessary security measures, and site-specific conditions <br /> Listed in Table 8 are general guidelines for developing site security and work zone definitions <br /> ' Table 8 Site Security and Work Zone Definition <br /> WORKING IN STREET OR ROADWAY <br /> ■ Wear traffic vest and hardhat when vehicle hazard exists <br /> ■ Use cones, flag-mounted cones, caution tape, and/or barricades <br /> ' ■ Use vehicle strobe light and block area with truck <br /> ■ Develop traffic patternization plan for high traffic situations <br /> • use flag person, <br /> • use flashing arrow sign, <br /> • use "MEN WORKING" signs liberally, <br /> • obtain lane closing permits, and <br /> • <br /> engage police details <br /> WORKING AT EXCAVATIONITRENCHING SITES <br /> ' ■ "Competent person" is required per CAL/OSHA Title 8 CCR, Section 1 504 <br /> ■ Safetyguard opera excavations by restricting unauthorized access <br /> ■ Highlight work area using prominent warning signs (cones, saw horses/barricades, and <br /> ' signage) placed a minimum of 10 feet back from excavation opening <br /> ■ Maintain zone definition along perimeter with continuous string of yellow orange caution <br /> tape <br /> ' EXCAVATIONS LEFT UNATTENDED OR OVERNIGHT <br /> Use one of the following methods to address these situations <br /> ' ■ Surround entire perimeter with plastic or cloth construction net fencing Anchor fence <br /> to ground using steel posts driven into ground Space out posts no greater than 8 feet <br /> apart Fence height minimum 4 feet high Fence material must be of a quality capable <br /> of withstanding a pressure of 200 pounds Place fence a minimum of 10 feet back <br /> from excavation opening <br /> ■ Place 8-feet long barricades affixed with flashing lights end to end with 4-foot high <br /> construction net fence attached to barricades <br /> ■ Utilize temporary curbing or concrete "jersey" barriers affixed with flashing signal lights <br /> or other effective warning signs <br /> �I <br />