Laserfiche WebLink
SEP 25 ' 97 17 : 54 FR LEUINE FRICKE 510 6524906 TO WILBUR SMITH P . 02i13 <br /> 01 � • <br /> September 25, 1997 <br /> 4111. 90.0W <br /> via fax and overnight mail <br /> A.J. Birkbeck, Esy_ <br /> 7evnik Horton Guibord & McGovern <br /> 77 West Wacker Drive, 33rd Floor <br /> Chicago, Illinois 60601 <br /> Subject: Request for Site Access, October Field Activities, Lincoln Center, Stockton, California <br /> Dear A.J.: <br /> On behalf of the Settling Dry Cleaning Defendants, and pursuant to [rum 7.8 of the final Task List <br /> from the August 26, 1997 Periodic Meeting ("the Task List"), Levine•Fricke-Recon Inc. (LFR) <br /> hereby requests access to Lincoln Center to perform the following activities: <br /> • Conduct an additional utility survey to locate water lines in the southern portion of Lincoln <br /> Center on Tuesday, October 7, 1997, between the hours of 8:00 a.m. and 6..00 p.m. This <br /> work is being performed based on the results of the site walk conducted on Monday, <br /> September 22, 1997 with LFR and Lincoln Properties, Ltd. (LPI.) personnel. Any additional <br /> utilities identified will be surveyed on Wednesday, October 8, 1997 as described below. <br /> Conduct survey activities on Wednesday evening, October 8, 1997, through Thursday <br /> morning, October 9, 1997, between the hours of 8:00 p.m. and 7:00 a.m., to survey additional <br /> soil-vapor sampling points that have been completed at Lincoln Center and any additional <br /> utilities identified m the southern portion of Lincoln Center. <br /> • Perform monthly fluid-level measurements on Monday evening, October 13, 1997, through <br /> Tuesday morning, October 14, 1997, between the hours of 8:00 p.m. and 7:00 a.m. As we <br /> have discussed in the past, groundwater monitoring wells MW-7, MW-9, MW-11, MW-12, <br /> and MW-21 will not be accessed between the hors of 8:00 p.m. and 10:00 p.m., and well <br /> MW-3 will not be accessed between the hours of 8:00 p.m. and 12:00 midnight. <br /> • Conduct flux chamber reconnaissance sampling for two days during the week of October 13, <br /> 1997, between the hours of 8:00 a.m. and 6:00 p.m. We have tentatively scheduled this work <br /> for Thursday, October 16, and Friday, October 17, 1997; however, the specific day depends <br /> on contractor availability. Additional flux chamber sampling will be conducted in November <br /> 1997. A description of this scope of work is being provided under separate cover. <br /> • Install dedicated pump equipment at monitoring well MW-8 on Monday, October 27, 1997, <br /> between the hours of 8:00 a.m. and 6:00 p.m. A description of this scope of work is being <br /> provided under separate cover. <br /> 1900 Powell Street. t2if1 Floor. Emeryville, California 84608-1827 • (510) 652-4500 • fax (510) 652-2246 <br /> Offices Worldwide <br />