<br /> Subject: Request for Site Access, October Field Activities, Lincoln Center, Stockton, California
<br /> Dear A.J.:
<br /> On behalf of the Settling Dry Cleaning Defendants, and pursuant to [rum 7.8 of the final Task List
<br /> from the August 26, 1997 Periodic Meeting ("the Task List"), Levine•Fricke-Recon Inc. (LFR)
<br /> hereby requests access to Lincoln Center to perform the following activities:
<br /> • Conduct an additional utility survey to locate water lines in the southern portion of Lincoln
<br /> Center on Tuesday, October 7, 1997, between the hours of 8:00 a.m. and 6..00 p.m. This
<br /> work is being performed based on the results of the site walk conducted on Monday,
<br /> September 22, 1997 with LFR and Lincoln Properties, Ltd. (LPI.) personnel. Any additional
<br /> utilities identified will be surveyed on Wednesday, October 8, 1997 as described below.
<br /> Conduct survey activities on Wednesday evening, October 8, 1997, through Thursday
<br /> morning, October 9, 1997, between the hours of 8:00 p.m. and 7:00 a.m., to survey additional
<br /> soil-vapor sampling points that have been completed at Lincoln Center and any additional
<br /> utilities identified m the southern portion of Lincoln Center.
<br /> • Perform monthly fluid-level measurements on Monday evening, October 13, 1997, through
<br /> Tuesday morning, October 14, 1997, between the hours of 8:00 p.m. and 7:00 a.m. As we
<br /> have discussed in the past, groundwater monitoring wells MW-7, MW-9, MW-11, MW-12,
<br /> and MW-21 will not be accessed between the hors of 8:00 p.m. and 10:00 p.m., and well
<br /> MW-3 will not be accessed between the hours of 8:00 p.m. and 12:00 midnight.
<br /> • Conduct flux chamber reconnaissance sampling for two days during the week of October 13,
<br /> 1997, between the hours of 8:00 a.m. and 6:00 p.m. We have tentatively scheduled this work
<br /> for Thursday, October 16, and Friday, October 17, 1997; however, the specific day depends
<br /> on contractor availability. Additional flux chamber sampling will be conducted in November
<br /> 1997. A description of this scope of work is being provided under separate cover.
<br /> • Install dedicated pump equipment at monitoring well MW-8 on Monday, October 27, 1997,
<br /> between the hours of 8:00 a.m. and 6:00 p.m. A description of this scope of work is being
<br /> provided under separate cover.