OCT 3 ' 97 11 : 56 FR LEVINE FRICKE 510 6524906 TO 12094683433 P , 02/07
<br /> ,
<br /> adom
<br /> September 25, 1997 4111. 9p.Op6
<br /> via fax arra ovem ght mail nra '✓
<br /> an
<br /> A.). Birkbeck, Esq. Us ✓
<br /> Zevnik Horton Guibord&McGovern to
<br /> 77 West Wacker Drive, 33rd Floor sat
<br /> Chicago, Illinois 60601
<br /> Subject: Request for Site Access, October Field Activities, Lincoln Center, Stockton, California
<br /> Dear A.J-:
<br /> On behalf of the Settling Dry Cleaning Defendants, and pursuant to Item 7.8 of the final Task List
<br /> from the August 26, 1997 Periodic Meeting("the Task List"), Levine•Fricke-Recon Inc, (LFR)
<br /> hereby requests access to Lincoln Center to perform the following activities:
<br /> • Conduct an additional utility survey to locate water lines in the southern portion of Lincoln
<br /> Center on Tuesday, October 7, 1997, between the hours of 8:00 a.m. and 6:00 p.m. This
<br /> work is being performed based on the results of the site walk conducted on Monday.
<br /> September 22, 1997 with LFR and Lincoln Properties, Ltd. (LPL) personnel. Any additional
<br /> utilities identified will be surveyed on Wednesday, October 8, 1997 as described below.
<br /> • Conduct survey activities on Wednesday evening, October 8, 1997, through Thursday
<br /> morrung, October 9, 1997, between the hours of 8:00 p.m. and 7:00 a.m., to survey additional
<br /> soil-vapor sampling points that have been completed at Lincoln Center and any additional
<br /> utilities identified in the southern portion of Lincoln Center.
<br /> • Perform monthly fluid-level measurements on Monday evening, October 13, 1997, through
<br /> Tuesday morning, October 14, 1997, between the hours of 8:00 p.m. and 7:00 a.m. As we
<br /> have discussed in the past, groundwater monitoring wells MW-7, MW-9, MW-11, MW-12,
<br /> and MW-21 will not be accessed between the hours of 8:00 p.m. and 10:00 p.m., and well
<br /> MW-3 will not be accessed between the hours of 8:00 p.m. and 12:00 midnight.
<br /> • Conduct flux chamber reconnaissance sampling for two days during the week of October 13,
<br /> 1997, between the hours of 8:00 a.m. and 6:00 p.m. We have tentatively scheduled this work
<br /> for Thursday, October 16, and Friday, October 17, 1997; however, the specific day depends
<br /> on contractor availability. Additional flux chamber sampling will be conducted in November
<br /> 1997. A description of this scope of work is being provided under separate cover.
<br /> • Install dedicated pump equipment at monitoring well MW-8 on Monday, October 27, 1997,
<br /> between the hours of 8:00 a.m. and 6:00 p.m. A description of this scope of work is being
<br /> provided under separate cover.
<br /> 1900 Powell Street, 12th Foor, Emeryville, California 84608-1827 • (510) 652=4500 - fax (510) 652-2246
<br /> Offices Worldwide
<br />
|