My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_2006-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
FIELD DOCUMENTS_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:02:16 PM
Creation date
3/31/2020 2:18:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
2006-2007
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEER <br /> LEVINEā¢FRICKE <br /> Date: October 16, 2006 INTEROFFICE MEMORANDUM <br /> To: Drilling and Construction Subcontractors,Jason Triolo, Tim Dowing, Don <br /> Bradshaw, and Mark Adams <br /> From: Lucas Goldstein, LFR <br /> Subject: DRAFT Detailed Work Hours, Phase IV IRA, Lincoln Center, Stockton, CA <br /> This memorandum outlines the work hours for the phase IV IRA, Lincoln Center, Stockton, <br /> California. Work shall be conducted in accordance with the wok hours presented below: <br /> Work Work Area Work Hours for Well Work Hours for Trenching <br /> Area Description Installation(i.e.Drilling) and Vault Installation(i.e. <br /> ID Construction) <br /> 1 West 6 PM to 6 AM for locations 5 AM to 5 PM <br /> immediately adjacent to <br /> Benjamin Holt, and 10 <br /> PM to 6 AM for remaining <br /> locations <br /> 2 South drive lane* 12 PM to 6 AM* 4 AM to 10 AM* <br /> 3 Southwest 10 PM to 6 AM 5 AM to 5 PM <br /> 4 East 6 PM to 6 AM 5 AM to 5 PM <br /> 5 North(includes 10 PM to 6 AM 4 AM to 10 AM* <br /> North drive lane*) <br /> Notes: <br /> *LFR and its subcontractors shall implement traffic control (including detour signs)while trenching <br /> or drilling in drive lanes at entrances to the parking lots. <br /> ** Work area boundaries shown on figure C2, attached <br /> LFR and its subcontractors shall minimize the size of work areas and shall implement traffic control <br /> to facilitate traffic flow on or near drive lanes. <br /> System startup activities(i.e. non-construction)may be conducted during start on the eastern portion <br /> of the site and progress to the west. <br /> Trenching and vault installation shall start after December 26'h. Work shall be completed in a work <br /> area before advancing to the next work area. <br /> All materials,wastes, and equipment shall be removed from the work site by the end of each <br /> day/shift. <br />
The URL can be used to link to this page
Your browser does not support the video tag.