Laserfiche WebLink
DEER <br /> LEVINE•FRICKE <br /> Date: October 16, 2006 INTEROFFICE MEMORANDUM <br /> To: Drilling and Construction Subcontractors,Jason Triolo, Tim Dowing, Don <br /> Bradshaw, and Mark Adams <br /> From: Lucas Goldstein, LFR <br /> Subject: DRAFT Detailed Work Hours, Phase IV IRA, Lincoln Center, Stockton, CA <br /> This memorandum outlines the work hours for the phase IV IRA, Lincoln Center, Stockton, <br /> California. Work shall be conducted in accordance with the wok hours presented below: <br /> Work Work Area Work Hours for Well Work Hours for Trenching <br /> Area Description Installation(i.e.Drilling) and Vault Installation(i.e. <br /> ID Construction) <br /> 1 West 6 PM to 6 AM for locations 5 AM to 5 PM <br /> immediately adjacent to <br /> Benjamin Holt, and 10 <br /> PM to 6 AM for remaining <br /> locations <br /> 2 South drive lane* 12 PM to 6 AM* 4 AM to 10 AM* <br /> 3 Southwest 10 PM to 6 AM 5 AM to 5 PM <br /> 4 East 6 PM to 6 AM 5 AM to 5 PM <br /> 5 North(includes 10 PM to 6 AM 4 AM to 10 AM* <br /> North drive lane*) <br /> Notes: <br /> *LFR and its subcontractors shall implement traffic control (including detour signs)while trenching <br /> or drilling in drive lanes at entrances to the parking lots. <br /> ** Work area boundaries shown on figure C2, attached <br /> LFR and its subcontractors shall minimize the size of work areas and shall implement traffic control <br /> to facilitate traffic flow on or near drive lanes. <br /> System startup activities(i.e. non-construction)may be conducted during start on the eastern portion <br /> of the site and progress to the west. <br /> Trenching and vault installation shall start after December 26'h. Work shall be completed in a work <br /> area before advancing to the next work area. <br /> All materials,wastes, and equipment shall be removed from the work site by the end of each <br /> day/shift. <br />