Laserfiche WebLink
APN 9741073 Middle Parcel <br /> Boring Depth of Well Screen Filter Seal <br /> Well ID Date Well Diameter Boring(feet Casing Interval Pack Filter Pack Interval Destruction Method <br /> Installed Type (inches) bgs linear feet) Diameter (feet bgs) Interval (feet bgs) <br /> inches feet b s <br /> AS-1 12/13/06 Vertical 8 57.5 2 54-57 53-57 #3 Sand 3 -53 Overdrill <br /> AS-2 11/14/06 Vertical 8 56 2 53.5 -56 52.5-56 #3 Sand 3 -52.5 Overdrill <br /> AS-3 11/13/06 Vertical 8 56 2 53.5 -56 52.5 -56 #3 Sand 3 -52.5 Overdrill <br /> AS-4 1/31/07 An led 8 58/70 2 55-58 54-58 #3 Sand 3 -54 Overdrill <br /> AS-5 1/9/07 An led 8 62/63 2 60-63 59-63 #3 Sand 3 -59 Overdrill <br /> AS-6 1/29/07 Angled 8 58/59 2 55-58 55-58 #3 Sand 3 -55 Overdrill <br /> AS-7 1/30/07 Angled 8 58/70 2 55 -58 55-58 #3 Sand 3 -55 Overdrill <br /> AS-8 12/11/06 Vertical 8 56 2 53 -56 52-56 #3 Sand 3 -52 Overdrill <br /> AS-9 12/12/06 Vertical 8 57 2 54-57 53 -57 #3 Sand 3 -53 Overdrill <br /> AS-10 12/20/06 Vertical 8 59 2 56-59 55-59 #3 Sand 3 -55 Overdrill <br /> AS-11 12/19/06 Vertical 8 58 2 55 -58 1 54-58 #3 Sand 3 -54 Overdrill <br /> AS-12 1/4/07 Vertical 8 59 2 56-59 55-59 #3 Sand 3 -55 Overdrill <br /> AS-13 12/12/06 Vertical 8 56 2 53 -56 52-56 #3 Sand 3 -52 Overdrill <br /> AS-14 1/25/07 Vertical 8 58 2 55 -58 54-58 #3 Sand 3 -54 Overdrill <br /> AS-15 12/15/06 Vertical 8 57 2 54-57 53 -57 #3 Sand 3 -53 Overdrill <br /> AS-16 12/14/06 Vertical 8 59 2 55-58 54-58 #3 Sand 3 - 54 Overdrill <br /> AS-17 1/18/07 Vertical 8 60 2 57-60 56-60 #3 Sand 3 -56 Overdrill <br /> AS-18 12/18/06 Vertical 8 58 2 55 -58 55-58 #3 Sand 3 -55 Overdrill <br /> AS-19 1/11/07 Vertical 8 58 2 55 -58 55-58 #3 Sand 3 -55 Overdrill <br /> AS-20 1/10/07 Vertical 8 60 2 57-60 56-60 #3 Sand 3 -56 Overdrill <br /> AS-21 12/8/06 Vertical 8 60 2 56.5-59.5 55.5-59.4 #3 Sand 3 -55.5 Overdrill <br /> AS-22 12/14/06 Vertical 8 58 2 55-58 54-58 #3 Sand3 -54 Overdrill <br /> AS-23 12/6/06 Vertical 8 60 2 57-60 56-60 #3 Sand 3 -56 Overdrill <br /> AS-24 12/7/06 Vertical 8 62 2 58-61 57-61 #3 Sand 3 -57 Overdrill <br /> Page I of <br />