Laserfiche WebLink
LH-SF TEL hio . 1 415 245 93a''�Pug 06 , 90 1021 P . 02,`n.-5 <br /> r STATE OF CALIFORNIA GEORGE DEUKMEJIAN Oevune. <br /> CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD-- ''w\ <br /> CENTRAL VALLEY REGION <br /> 3449 ROUTIER ROAD. SUITE A D � <br /> SACRAMENTO. CA 95827-3098 1+t �) �� \�2•,,,W,;Np� <br /> 19 VV l/1pCA7� <br /> 90 <br /> 30 July 1990 <br /> Mr. Wilbur Smith <br /> Lincoln Properties Limited <br /> 374 Lincoln Street <br /> Stockton, CA 95207 <br /> MODIFIED PHASE II (PHASE IIB) SITE ASSESSMENT WORK PLAN COWfENTS, LINCOLN VILLAGE <br /> CENTER, STOGKTON, SAN JOAQUIN COUNTY (CASE NO. 3002) <br /> We have reviewed the above referenced report submitted by Leedshill-Herkenhoff, <br /> Inc. , on 14 June 1990. The work plan as submitted is adequate for the <br /> intermediate site assessment, with the two exceptions noted below. <br /> Documentation that all sewer line flow leaving Lincoln Village Center is to the <br /> 10 inch VCP sewer line between McClellan Way and Benjamin Holt Drive must be <br /> provided. <br /> A schedule for implementation of components of the work plan and submittal of a <br /> Phase 118 site assessment report must be provided by 24 August 1990. <br /> If we can be of assistance, please call Richard McHenry at (916) 361-5656. <br /> . <br /> ANTONtAVORSTER <br /> Senior Engineer <br /> RPM:ej <br /> cc: /Mr. Gerry S. Nakano, Leedshill-Herkenhoff, Inc. San Francisco <br /> Ms. Brooke Bierke, Neumiller & Beardslee, Stockton <br />