Laserfiche WebLink
ROUTING FORM Neumiller & Beardslee <br /> Date Received: A PROFESSIONAL CORPORATION <br /> ATTORNEYS AND COUNSELORS MAILING OXOADDRESS: <br /> P.O. BOX IA <br /> ��e�� ® =TOCNTON. NE ORNIA 8-8201-30200 <br /> G FIFTH FLOOR WATERFRONT OFFICE TOWER It TELEPHONE <br /> Izosl sae-azoo <br /> 509 WEST WEBER AVENUE PAX I2oe1 s<e-Delo <br /> OCT 2 2 1990 STOCKTON. CALIFORNIA 95203 <br /> ENVIR RMMEN AL ERV CESLTH <br /> October 18 , 1990 <br /> Ron n, Al ti, Ronl RECEIVED <br /> Olsen, Al <br /> Kaufman, Fred III <br /> Heran, Donna0 CT 2 2 1990 <br /> Cotulla, Laurie IV <br /> Hudson, Alison ENVIRONMENTAL HEALTH <br /> Y 1 works PERMIT/SERVICES <br /> Biedermann, Alan ( Department <br /> Dunham, Loretta <br /> Hernandez, Yolanda / / ' UIC5 � <br /> McCarty, Linda 310 <br /> Reid, Nora iia 95201 <br /> Seabourn, Vickie <br /> Singleton, Joanne <br /> Tapp, Carleen <br /> Vargas, RosieI <br /> � W :phone conversation on Monday, October 15, <br /> ton inner of Leedshill-Herkenhoff, Inc. ("LH") , <br /> has agreed to allow LH access to San <br /> county municipal wells number 2 and 6 located on <br /> Gettysburg Place at the Lincoln Village Shopping Center in <br /> Stockton, California. The purpose for access to these wells <br /> will be to remove the pumps, produce a TV video of the well, <br /> monitor water levels, and collect water samples for <br /> analytical testing. The pumps removed from these wells will <br /> remain the property of San Joaquin County, and will be <br /> transported to a nearby location of your choice. <br /> After the pumps are pulled, a locking or bolt-on cover <br /> will be attached to the casings to preclude public access . <br /> Lh will complete the video taping and sampling of these two <br /> wells by January 1 , 1991 . As agreed, this letter will also <br /> confirm that ownership of both wells will remain with San <br /> Joaquin County and any future use, or responsibility for <br /> these wells after January 1 , 1991 , will be the obligation of <br /> San Joaquin County. <br /> The pumps are scheduled to be pulled starting Wednesday, <br /> October 24 , 1990 . If you have any questions concerning this <br /> proposed operation or have any discrepancy with the content <br />