Laserfiche WebLink
• <br /> CLEANUP AND ABATEMENT ORDER - -4- <br /> SIMS-GRUPE MANAGEMENT CORPORATION <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> 2. By 1 February 1992, submit the following for Board approval : <br /> (1) the Work Plan describing the investigation and definition of off-site <br /> pollution, including a soil vapor survey along the sewer line easement west <br /> of Lincoln Village Shopping Center between McClellan Way and Benjamin Holt <br /> Drive. <br /> (2) the Sampling and Analysis Plan describing the oring well sampling and <br /> sample custody procedures proposed to ensu ound water samples are <br /> representative and are not contaminated duri ha ing and transport. <br /> (3) the Quality Assurance Project Plan spec' ing the qua ' v assurance/quality <br /> control procedures proposed for t gro d water sampling and sample <br /> analyses. <br /> (4) the Community Relations Plan. <br /> INTERIM REMEDIAL MEASURES FINAL REMEDIAL MEASURES <br /> 3a By 1 February 1992, sub for 31 By 1 June 1992, submit for Board <br /> Board approval an Int medial approval a Baseline Health Risk <br /> Measures (IRM) Work n Assessment. <br /> describing a propose s f <br /> possible site remedia 'o 4b By 12 June 1992, submit for Board <br /> alternatives. the W Plan, approval a report compiling and <br /> the Dischar 1 prop a to interpreting the results of Phase <br /> evaluate pote ally III of the site investigation <br /> applicable s it an round water (Phase III report) . <br /> cleanup alt e n ti in addition <br /> to all potents sposal options 5b If the Phase III site investigation <br /> for the treated ground water. defines the extent of the polluted <br /> soil and ground water, as <br /> 4a Within 45 days of Board approval determined by the Board's review of <br /> of the IRM Work Plan, submit for the report, within 30 days of Board <br /> Board approval a draft IRM approval of the report, submit for <br /> Alternative Analysis Report which Board approval a Final Remedial <br /> shall recommend the IRM(s) Investigation Report responding to <br /> selected by the analysis. the Board's comments on the Phase <br /> III Report. <br /> 6b If the Phase III Report does not <br /> define the vertical and lateral <br /> extent of the soil and ground water <br /> pollution, as determined by the <br /> Board's review of the report, <br /> submit for Board approval within 30 <br /> days of Board comments on the <br /> report, a Work Plan describing <br /> additional site investigation <br /> (Phase IV Work Plan) . <br />