My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1987-1992
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1987-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:01:00 PM
Creation date
3/31/2020 2:27:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1987-1992
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEMENT ORDER - _6- <br /> SIMS-GRUPE MANAGEMENT CORPORATION <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> INTERIM REMEDIAL MEASURES (cont. ) FINAL REMEDIAL MEASURES (cont. ) <br /> 8a Within 30 days of Board approval 12b Within 30 days of Board approval of <br /> of the Final IRM Design, begin to the draft 100 percent RD, submit a <br /> install the approved IRM soil and Final RD Plan incorporating Board <br /> ground water treatment systems. comments and begin implementation <br /> 9a The Dischargers shall start up the of the plan. <br /> Board-approved cleanup remedy(ies) 13b Within 3 d ys of Board approval of <br /> no later than 1 June 1993 and the dr percent RD, submit <br /> shall continue to operate them. for Board ap al an Operations <br /> aaintenanc Ian specifying <br /> 10a Within 30 days of remedy startup, r atment sytems operational <br /> submit for Board approval a roc res, and describing and <br /> monitoring program (MP) designed uling routine maintenance <br /> to evaluate the IRM's ground water p dures. <br /> extraction and treatment <br /> effectiveness. <br /> 14. By 18 September 1992 and annually h reafter review and, if necessary, propose <br /> modifying and expanding ound w t r monitoring program (MP) . The Discharger <br /> shall comply with the ac a Monito ing and Reporting Program. <br /> 15. The Discharger shall e' urs he Board for all reasonable costs for work <br /> required to oversee the i harger's investigation and cleanup of the soils and <br /> ground water u d by t Discharger. <br /> 16. Technical its s mitted to the Board in response to this order shall be <br /> prepared by ali o nia Registered Civil Engineer, Registered Geologist, or <br /> Certified Engi Geologist with experience in contaminated soil and ground <br /> water cleanups. <br /> 17. The Discharger shall provide to the Board all information necessary for the Board <br /> to comply with the California Environmental Quality Act. <br /> WILLIAM H. CROOKS, Executive Officer <br /> DATED: 19 December 1991 <br />
The URL can be used to link to this page
Your browser does not support the video tag.