My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:36 PM
Creation date
3/31/2020 2:32:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1997
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11eving Fricke-at <br /> ENGINEERS,If EQIOGISTS 6 A PUED SpENi1ST5 <br /> keep all equipment in place during the duration ofthe work. Other than cordoning off the work <br /> area using traffic cones and barrier tape, no other traffic control measures are anticipated. <br /> Proposed Schedule <br /> We are requesting access to Lincoln Center for the period of May 18 through May 30, 1997, to <br /> Perform the drilling activities described above. We anticipate that the work would take <br /> approximately five to seven days to complete. Active drilling will be performed during nighttime <br /> hours (10:00 p.m. to 9:00 a.m.) as defined in your'letter of March 31, 1997, which granted access <br /> for the MW-21 evaluation. During non-active periods (9 a.m. to 10 p.m.), all equipment would <br /> remain in place as necessary within the work area and would be protected by a security guard. If <br /> the work progresses at a rate that will require continuation of drilling beyond the weekend, the <br /> work tasks scheduled for the last night of the work week(Thursday) will be sequenced so that all <br /> possible extraneous.equipment can be moved off site to Minimize rs <br /> the weekend. Regardless of this effort, a minimum of four parking paces will ion to need to 1e e�over <br /> blocked over the weekend. <br /> The exact start date for this work will be selected based on the drillers' schedule, completion of <br /> boring permits, and granting of access by LPL. We will notify you no later than 72 hours before <br /> work begins. In accordance with item 2C.2 of the draft Task List from the April 30, 1997 Periodic <br /> Meeting, please respond to this request by noon on May 14, 1997. <br /> Please call me if you have any questions concerning our recommendation. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> cc: Robert C. Thompson, Esq., LeBoeuf, Lamb, Greene&MacRae <br /> John J. Gregory, Esq., LeBoeuf, Lamb, Greene &MacRae <br /> Michael C. Donovan, Esq., Zevnik Horton Guibord& McGovern <br /> John Meyer, Esq., Zevnik Horton Guibord & McGovern <br /> Wilbur H. Smith II, Esq., Lincoln Properties, Ltd. <br /> Anne M. Farr, Ph.D., Farr Associates (2 copies) <br /> LCM W2I-3.LTR:SRL 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.