Laserfiche WebLink
LINCOLN CENTER • <br /> PROJECT UPDATE <br /> 10/29/97 <br /> I. Introduce Attendees <br /> 2. RI/FS Work Plan <br /> a. Source Area Investigation <br /> Sewer Line Video <br /> Soil Vapor Investigation <br /> CPT/PIPP Investigation <br /> b. Plume Perimeter Investigation <br /> CPT/PIPP Investigation <br /> Monitoring Well histallation/Development/Sampling <br /> Soil Vapor Investigation <br /> C. Periodic Monitorin <br /> Monitoring Well Integrity Assessment <br /> MW-21 Evaluation <br /> Monthly Water Level Events <br /> Quarterly Groundwater Sampling <br /> d. RI Schedule <br /> Field Work <br /> Draft RI Report <br /> 3. PhaseIIRA— Mw,„,�z� �h�tttnstt ar. <br /> a. Field Scoping Activities <br /> b. Proposed Detailed Plan <br /> C. NPDES/POTW Permits <br /> d. Schedule <br /> 4. Phase II IRA-- Rr~vs vK"S <br /> a. Work Plan <br /> b. Schedule <br />