My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> L7 Levinefricke•Recon <br /> ENGINEERS,HYDROGEOLOGISTS 8 APPLIED SCIENTISTS <br /> LETTER OF TRANSMITTAL <br /> September 4, 1998 4111.80-002 <br /> To: PARTIES ON THE ATTACHED DISTRIBUTION LIST <br /> Re: Revisions to the Quarterly Monitoring Plan and the Work Plan for Environmental <br /> Investigation, Lincoln Center, Stockton, California <br /> The following items are enclosed via U.S. Mail. <br /> No. of Copies <br /> Description Anne Farr All Others <br /> Revision No. 2 to the Quarterly Monitoring Plan(QMP) 3 1 <br /> Revision No. 5 to the Quality Assurance Project Plan(QAPP), Appendix C to the 3 1 <br /> "Work Plan for Environmental Investigation, Lincoln Center,Stockton, California," <br /> dated September 23, 1996, and revised August 21, 1998 ("the RIMS Work Plan") <br /> Revision No. 1 to the Health and Safety Plan(HSP), Appendix F to the RDFS Work 3 I <br /> Plan <br /> The item(s) are transmitted: ❑ At your request ❑ For your action <br /> ❑ For your review/comment For your files <br /> ❑ For your approval ❑ For your information <br /> Comments: 1. The subject documents have been approved by the Regional Water Quality Control Board, <br /> Central Valley Region(RWQCB), and are dated August 21, 1998. <br /> 2. Please discard any previous versions of the QMP. <br /> 3. To update your copy of the QAPP, please use the instructions printed on colored paper. <br /> 4. The Field Sampling Plan(FSP; Appendix B to the RI/FS Work Plan) was also updated on <br /> August 21, 1998; however, we are postponing distribution of this document pending RWQCB <br /> approval of additional revisions. If you wish to receive an interim copy of the FSP, please <br /> contact the undersigned at 510-652-4500. <br /> Sincerely, <br /> arL �— <br /> ae Anderson, Project Assistant <br /> 1900 Powell Street, 12th Floor, Emeryville, California 94608-1827 • (510) 652-4500 fax (510) 652-2246 <br /> Offices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.