Laserfiche WebLink
B U R <br /> LEVINE• FRICKE <br /> April 23, 2001 6752.00-017 <br /> Mr. Mark Adams, R.G. <br /> Point Environmental <br /> 137 Park Place <br /> Richmond, California 94801 <br /> Subject: Cost Estimate for Implementation of the Proposed Phase III Interim Remedial Action <br /> Detailed Plan, Lincoln Center, Stockton, California <br /> Dear Mr. Adams: <br /> Enclosed is the requested feasibilty study level cost estimate for implementation of the scope of <br /> work identified in the "Proposed Phase III Interim Remedial Action Detailed Plan, Lincoln Center, <br /> Stockton, California," submitted to the Regional Water Quality Control Board on April 2, 2001. <br /> If you have any questions or require additional information, please contact either of the <br /> undersigned at (510) 652-4500. <br /> Sincerely, <br /> DonaldT. Bradshaw, R.G. Ramkishore Rao, P.E. <br /> Principal Hydrogeologist Project Engineer <br /> Enclosure <br /> cc: Joe Mello, Regional Water Quality Control Board <br /> Michael Infurna, San Joaquin County Public Health Services <br /> Donald Moore, AIG Environmental <br /> Katherine Wagner, Downey, Brand, Seymour & Rohwer <br /> David Gouker, City of Stockton Public Library <br /> David B. Durrett, Esq., Lewis, D'Amato, Brisbois & Bisgaard <br /> Anne Farr, PhD., Farr Associates <br /> Phil Johnson, Sims Grupe Management <br /> 1900 Powell Street, 12th Floor, Emeryville, California 94608-1827 • (510) 652-4500 • fax (510) 652-2246 www.ifr.com <br /> Offices Worldwide <br />