Laserfiche WebLink
Table 1 <br /> Estimated Costs for Implementation of Phase III IRA <br /> Lincoln Center, Stockton, California <br /> Estimated Estimated <br /> Estimated Unit Cost Total Cost <br /> Item/Description Quantity Unit M W <br /> CAPITAL COSTS <br /> Task 1:B-Zone Aquifer Test <br /> B-Zone Step-Drawdown Test 1 lump sum $15,700 $15,700 <br /> B-Zone Constant Discharge and Recovery Tests I lump sum $17,800 $17,800 <br /> B-Zone Aquifer Test Analysis 1 lump sum $8,300 $8,300 <br /> B-Zane Piezometer/Extraction Well Installation <br /> Well permitting 1 lump Sam $508 $500 <br /> Well Installation <br /> 2 wells $26,000 $52,000 <br /> Waste Disposal 1 lump sum $5,000 $5,00 <br /> Task 1 Total: $99,000 <br /> Task 2:Design and Modeling <br /> Remedial Action-Design and Modeling 1 lump sum $63,000 $63,000 <br /> Task 2 Total: $63,000 <br /> Task 3:Expansion of GWETS <br /> Direct Capital Costs for Expansion of GWETS <br /> Preliminary Costs <br /> Mobilization 1 lump sum $20,000 $20,000 <br /> Traffic and Health&Safety Plans 1 lump sum $10,000 $10,000 <br /> Extraction Well Construction <br /> A-Zone Well Drilling, Installation, and Development 5 each $10,000 $50,000 <br /> B-Zone Well Drilling, Installation, and Development[ 9 each $18,000 $162,000 <br /> Piezometer Construction <br /> A-Zone Piezometer Drilling, Installation, and Development 3 each $7,000 $21,000 <br /> B-Zone Piezometer Drilling, Installation, and Development 7 each $11,000 $77,000 <br /> Site Work <br /> Pipe Trenching 1,600 linear feet $20 $32,000 <br /> Soil Hauling(assuming all clean) 533 cubic yard $15 $8,000 <br /> Backfill/Compaction 533 cubic yard $20 $10,667 <br /> Asphalt Demolition 1,600 1 $18 $28,800 <br /> Wellhead Equipment Costs <br /> Pumps 15 each $1,000 $15,000 <br /> Level and Pressure Sensors 15 each $1,500 $22,500 <br /> Well Vaults and Completion 15 each $2,500 $37,500 <br /> Groundwater Treatment Equipment Costs(EC) <br /> Piping Inside Wells(A and B-Zone Extraction Wells) 1,850 linear feet $5 $9,250 <br /> Piping IT' x 4" double contained) 1,600 linear feet $15 $24,000 <br /> Conduit(3) 4,800 linear feet $5 $24,000 <br /> Total Equipment Costs $108,300 <br /> Costs-Phase_III_IRA-06752/Est Page 1 of 2 4/20/01 <br />