Laserfiche WebLink
OU R ENVIRONMENTAL MANAGEMENT&CONSULTING ENGINEERING <br /> August 1, 2007 001-06750-05-401 <br /> Mark Adams, Trustee <br /> Lincoln Center Environmental Remediation Trust <br /> 137 Park Place <br /> Richmond, California 94801 <br /> Subject: Response to California Regional Water Quality Control Board Comment Letter of June <br /> 14, 2007, Lincohl Center, Stockton, California <br /> Dear Mr. Adams: <br /> This letter responds to the California Regional Water Quality Control Board(the "RWQCB") <br /> Comment Letter of June 14, 2007, regarding Lincoln Center, Stockton, California. <br /> The RWQCB's June 14, 2007 letter transmitted comments regarding its review of LFR's June 9, <br /> 2007 "Proposed Phase V Interim Remedial Action Detailed Plan, Lincohl Center, Stockton, <br /> California" prepared on behalf of the Trust. <br /> For ease of review, LFR has italicized and numbered the RWQCB comments below and has <br /> included a response to each comment. <br /> RWQCB Comment 1: <br /> 1. On page 3 of the Draft Plcm it is stated, A contingency provision for implementing ERD in the <br /> B zone if favorable geochemical conditions do not persist is presented as part of the Phase V IRA. " <br /> The contingency plan for the B Zone is not detailed anywhere later in the document. A detailed <br /> plan for implementing ERD in the B Zone needs to be included in the revised Final Plan. Much <br /> stronger language is needed to clearly specify that the B Zone Plan is part of this Proposed Phase <br /> V Detailed Plan. <br /> Response 1: <br /> A plan and schedule for addressing the B-zone will be addressed and considered on a regular basis <br /> and will be included within the report being asked for by the RWQCB under the following <br /> comment#2. <br /> 512.895.0002 m <br /> 512.366.8003 1 <br /> 15808 Ranch Road 520 N,Wte 205 wwwjfccarn <br /> Austin,Texas 78717 <br /> Offices Notionwfdo <br />