Laserfiche WebLink
LFR <br /> RWQCB Comment 4: <br /> 4. Finally, the implementation of a B Zone contingency plan is not included in the schedule. The <br /> possibility of implementing ERD in the B Zone after the semiannual evaluation needs to be <br /> schematically shown on the schedule. <br /> Response 4: <br /> As noted above, a schedule will be considered part of the semi-annual report requested under <br /> comment#2 above. <br /> RWQCB Comment 5: <br /> Proposed A and B Zone Groundwater Monitoring Program. <br /> Per conference call discussions held on June 13, 2007, Mark Adams representing the Trust, LFR, <br /> John Farr representing Lincoln Properties Limited (LPL), and the Regional Water Board have <br /> agreed to changes in the monitoring proposed in the Draft Plan. Those changes are reflected in the <br /> table included below. It is our understanding that this table will be included, as is, in the Draft <br /> and Final Plan. <br /> 3 <br />