My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2006-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:57:14 PM
Creation date
3/31/2020 2:39:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2006-2007
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Mr. Mark Adams • - 3 - June 14, 2007 <br /> Summary of Monitoring Program <br /> Data ERD Upgradient ERD Area Downgradient <br /> Collection Injection Monitoring Wells Monitoring Monitoring Wells <br /> Wells Wells <br /> 22 proposed MW-004A Existing wells Existing Wells MW-113A, <br /> injection MW-020B MW-108A,MW- MW-114A,MW-20713, <br /> wells 20513, and and MW-208B <br /> MW0301C New wells MW-124A, <br /> New wells MW- MW-123A,and MW-215B <br /> 121 A,MW- <br /> 122A,and MW- <br /> 214B <br /> Injection Volumes hourly semiannually <br /> and Rates <br /> Contaminants and after semiannually baseline, during baseline,quarterly <br /> Daughter development injection,month 1 <br /> Products and 2,quarterly <br /> Field after semiannually baseline,during baseline,quarterly <br /> Biogeochemical development, injection,month I <br /> Parameters quarterly and 2,quarterly <br /> Laboratory semiannually baseline, during baseline,quarterly <br /> Biogeochemical injection, month 1 <br /> Parameters and 2,quarterly <br /> Organic Substrate baseline, semiannually baseline,during baseline,quarterly <br /> Indicators quarterly injection,months <br /> 1 and 2, quarterly <br /> Finally, although the Regional Water Board is not a party to the Amended First Final Consent <br /> Decree, we are unaware of any reason why the 45-day period for comment under the <br /> Amended First Final Consent Decree should not be waived for this Draft Plan. Thus, we have <br /> no objection to the shortening of the 45-day period for comment. <br /> If you have any questions or comments, please contact Marie McCrink at 916-464-4816, or by <br /> email at mtmccrink@wa'terboards.ca.gov. <br /> /� 40-1- I/�.te.(%'l <br /> MARIE T. McCRINK, P.G., C.H. <br /> Associate Engineering Geologist <br /> Site Cleanup Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.