Laserfiche WebLink
i Page 2 of 3 <br /> - <br /> install the traffic box that is required. Probes left in place over-night are considered <br /> 'wells' and as such, must be protected at the surface with a secured box and seal, <br /> like any vapor, monitoring, or sparge well. <br /> 5- if the probes are NOT removed the same day as installed, then a statement is <br /> needed that acknowledges that additional permits, with fees, for their destructions <br /> also will be needed as well as a mini-proposal/work plan for the method and <br /> materials of the destruction. <br /> 6- probe SG-5 shown on Figure 3 of your work plan is NOT on Lincoln Properties, <br /> the same parcel (APN: 097-410-73, "Lincoln Properties LTD", 1000 W. Ben Holt <br /> Drive) where proposed probes SG-3 & 4 are shown. SG-5 is on parcel 097-410-29, <br /> with an address listed with the County Assessor as, 6445 N. Pacific Ave", and is <br /> owned by the Silvia Fahn Trust. In order to install probe SG-5 on the Fahn <br /> property, another permit application, $89 fee, and a copy of a signed access <br /> agreement is to be submitted to the EHD. <br /> 7- lead agency work plan approval letter. <br /> Please get back to me with your intentions/submittals before end of work day, May <br /> 4. <br /> Although I appreciate your intention to provide the EHD with a complete packet for <br /> a drilling request, can you now see why we advise that two working weeks are <br /> typically required from the time you submit a packet until we will accept your request <br /> for a drill date? <br /> With so many items unaddressed or missing, I cannot confirm your drill date of May <br /> 6 until these items are adequately addressed. As such, your appointment request <br /> for May 6 is not approved at this time. <br /> Michael Infurna <br /> SJCEHD <br /> (209) 468-3454 <br /> From: Novarr, Davida [mailto:Davida.Novarr@arcadis-us.com] <br /> Sent: Friday, April 30, 2010 1:02 PM <br /> To: Mike Infurna [EH] <br /> Cc: Schliewen, Katrin; Goldstein, Lucas <br /> Subject: <br /> Hello Mike. On behalf of Katrin Schliewen and Lucas Goldstein, please find <br /> attached the San Joaquin County well permit package for ARCADIS to have 2 soil <br /> borings drilled at North Ben Holt Drive and 5 soil borings drilled at South Ben Holt <br /> Drive. The drilling will be conducted by TEG — the work is scheduled for May 12 — <br /> 14. <br /> Please note that this package contains 2 signed well permit applications (one for <br /> the No. Ben Holt work and one for the South Ben Holt work); the ARCADIS work <br /> plan and Site Plan. Checks for the well permit fees ($89/permit) will be sent <br /> 5/5/2010 <br />