My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:54:20 PM
Creation date
3/31/2020 2:44:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
1990
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF PUBLIC WORKS <br /> COUNTY OF SAN JOAQUIN <br /> STATE OF CALIFORNIA <br /> ADDENDUM NUMBER 1 <br /> TO PLANS AND SPECIFICATIONS FOR THE <br /> LINCOLN VILLAGE WELL DESTRUCTION <br /> 1. Revise Section 4, "Beginning of Work, Time of Completion, <br /> and Liquidated Damages" , as follows: the number of contract <br /> working days specified in paragraph 5 is changed from <br /> twenty-five (25) to forty (40) working days. <br /> 2 . Revise Section 14-1. 1, "Scope" , to include Cost Reduction <br /> Revisions of the Standard Specifications. <br /> 3. Revise Section 14-2 . 1, "Well Preparation" to clarify <br /> additional preparation work required for well LVMD 2 and <br /> LVMD 6. <br /> 4. Revise Section 14-2 . 2 , "Perforation" to provide for <br /> explosive shot perforation alternative for LVMD 1. <br /> 5. Revise Section 14-2 . 3 , "Surface Preparation" , to allow for <br /> excavation after completion of well grouting. <br /> Approved ✓ C(�G <br /> HENRY M. 4XRATA <br /> Director of Public Works <br />
The URL can be used to link to this page
Your browser does not support the video tag.