My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_2006-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_2006-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:55:58 PM
Creation date
3/31/2020 2:47:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2006-2007
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LFR Inc. <br /> CONTENTS <br /> CERTIFICATION <br /> 1.0 INTRODUCTION <br /> 1.1 Previous and Ongoing IRAs <br /> 1.2 Proposed Phase V IRA Objectives 2 <br /> 2.0 BACKGROUND <br /> 2.1 Historical Site Use 4 <br /> 2.2 Previous Investigations 5 <br /> 2.2.1 Groundwater investigations in the Vicinity of the Bank of Stockton .............6 <br /> 2.2.2 Previous Feasibility Studies for Groundwater Remediation using ERD..........7 <br /> 3.0 ACTIVITIES CONDUCTED IN SUPPORT OF PHASE V IRA 7 <br /> 3.1 Bank of Stockton MIP Investigation ..........................................................8 <br /> 3.2 Evaluation of Geochernical Parameters 9 <br /> 3.2.1 Geochernical Sampling Results........................................................ 10 <br /> 3.2.2 Laboratory-Analyzed Geochernical Results......................................... 10 <br /> 3.2.3 Field-Measured Geochemical Results................................................ 12 <br /> 3.2.4 Summary of Geochernical Results.................................................... 13 <br /> 3.3 Evaluation of cis-1,2-DCE Stall ............................................................. 13 <br /> 3.4 ERD Substrate Selection ...................................................................... 14 <br /> 3.4.1 Substrate Suitability..................................................................... 14 <br /> 3.4.2 Substrate Cost Considerations......................................................... 15 <br /> 3.4.3 Substrate Delivery Considerations.................................................... 17 <br /> 3.4.4 Recommended Substrate ............................................................... 17 <br /> 4.0 PROPOSED PHASE V IRA DETAILED PLAN................................................ 18 <br /> 4.1 Recommended ERD, Well Spacing and Layout............................................ 18 <br /> 4.2 ERD, Substrate Selection...................................................................... 19 <br /> 4.2.1 Substrate Requirement.................................................................. 20 <br /> 4.2.2 ERD Well Installation ..................................................................22 <br /> .p-PhV 1P.A-SepG7+ma1-06750.dm:1fr <br /> Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.