My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_2008-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_2008-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:59:40 PM
Creation date
3/31/2020 2:47:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2008-2014
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geospte& <br /> consultants <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION................................................................................................ 1 <br /> 1.1 WORK PLAN OBJECTIVE....................................................................... 1 <br /> 1.2 WORK PLAN CONTENT.......................................................................... 1 <br /> 2. SITE BACKGROUND......................................................................................... 3 <br /> 2.1 GEOLOGY AND HYDROGEOLOGY...................................................... 3 <br /> 2.1.1 Regional Geology and Hydrogeology............................................. 3 <br /> 2.1.2 Site Hydrostratigraphy....................................................................4 <br /> 2.1.3 Occurrence and Movement of Groundwater................................... 5 <br /> 2.2 SITE HISTORY .......................................................................................... 6 <br /> 2.2.1 Summary of Interim Remedial Actions.......................................... 7 <br /> 3. WORK PLAN OBJECTIVE AND RATIONALE............................................. 10 <br /> 3.1 DATA QUALITY OBJECTIVES............................................................. 10 <br /> 3.2 RATIONALE............................................................................................ 11 <br /> 3.3 CHEMICALS OF POTENTIAL CONCERN........................................... 14 <br /> 4. SCOPE OF WORK............................................................................................. 15 <br /> 4.1 PRE-FIELD ACTIVITIES........................................................................ 15 <br /> 4.1.1 Review of Current Field Conditions............................................. 15 <br /> 4.1.2 Utility Survey................................................................................ 15 <br /> 4.1.3 Permitting and Access................................................................... 16 <br /> 4.1.4 Pre-Field Meeting.......................................................................... 16 <br /> 4.2 INVESTIGATION ACTIVITIES ............................................................. 16 <br /> 4.2.1 Soil Borings................................................................................... 16 <br /> 4.2.2 Well Installation............................................................................ 18 <br /> 4.2.3 Field Quality Assurance Sampling................................................ 21 <br /> 4.2.4 Sample Nomenclature................................................................... 21 <br /> 4.2.5 Sample Packaging and Handling.................................................. 22 <br /> 4.2.6 Equipment Decontamination and Investigation Derived Waste... 23 <br /> 4.2.7 Survey of Sampling Locations......................................................23 <br /> 5. SCHEDULE ....................................................................................................... 24 <br /> it 18.05.12 <br /> Pre-Design Investigation Work Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.