My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_2008-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_2008-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:59:40 PM
Creation date
3/31/2020 2:47:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2008-2014
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeosyntecO <br /> consultants <br /> 4. SCOPE OF WORK <br /> To meet the stated objectives of this Work Plan, the following scope of work has been <br /> prepared. <br /> 4.1 PRE-FIELD ACTIVITIES <br /> Pre-field activities will include the preparation of a Health and Safety Plan (HASP), <br /> procurement of permits, underground utility survey, pre-field meeting, and <br /> subcontractor mobilization. <br /> 4.1.1 Review of Current Field Conditions <br /> Field conditions will be reviewed by staff before commencing field activities. The <br /> assessment will include the following items: <br /> • Evaluating existing and previously existing utilities in relation to the proposed <br /> sampling locations; <br /> • Ensuring safe access and movement within the work area; <br /> • Securing work areas with barricades or temporary fencing, if applicable; <br /> • Determining operational and traffic safety requirements; and <br /> • Assessing health and safety conditions. <br /> After a review of the field conditions has been completed, a HASP shall be prepared to <br /> supplement this Work Plan and the SAP. <br /> 4.1.2 Utility Survey <br /> Prior to commencement of field activities, Underground Services Alert (USA) will be <br /> notified of the intent to conduct subsurface investigation at least 48 hours prior to <br /> initiation of intrusive field tasks. USA will contact all utility owners of record within <br /> the site vicinity and notify them of the intention to conduct subsurface investigations in <br /> proximity to buried utilities. All utility owners of record, or their designated agents, <br /> will be expected to clearly mark the position of their utilities on the ground surface for <br /> utilities that are located in public areas. Utilities will be clearly marked on the ground <br /> surface and the investigation will be planned accordingly. <br /> Pre-Design Investigation Work Plan 15 18.05.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.