My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 4:27:29 PM
Creation date
3/31/2020 4:12:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 3
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V <br /> Kilgore Road. 0 100 <br /> Sacramento.CA 956770 <br /> 916-861-0400 rel <br /> 916-861-0430 F <br /> SainiteC <br /> March 22, 2011 <br /> Mr. Mike Infurna <br /> San Joaquin County Environmental Health Department <br /> 600 East Main Street <br /> Stockton, CA 95202-3029 <br /> RE: Site Redevelopment Status Update Letter <br /> ConocoPhillips Station No. 5449 <br /> Former Thrifty Oil Company Station No. 172 <br /> 7647 Pacific Avenue <br /> Stockton, California 95207 <br /> Mr. Infurna: <br /> On behalf of ConocoPhillips Company (ConocoPhillips) Stantec has prepared this letter to <br /> update the San Joaquin County Environmental Health Department (SJCEHD) regarding the <br /> status of planned site redevelopment activities and associated monitoring well installation <br /> and repairs. <br /> In a phone call received today from Miller Pacific, Inc., the contractors responsible for <br /> performing the site redevelopment activities, the required demolition and building permits <br /> will be obtained today. Building demolition activities are currently scheduled to be <br /> completed by March 25, 2011. Removal of site pavement and grading activities are not <br /> scheduled to be performed this week due to forecasted inclement weather. The building <br /> demolition and construction activities are scheduled to take approximately eight weeks to <br /> complete. Upon completion of site redevelopment activities, previously-proposed <br /> monitoring wells will be installed at the site, and wells protected by Stantec during fourth <br /> quarter 2010 will be repaired. <br /> If you have any questions or comments regarding this project, please contact Diane Barclay <br /> at(916) 861-0400. <br /> Sincerely, <br /> STANTEC CONSULTING CORPORATION <br /> Benjamin Chevlen, PG <br /> Senior Geologist <br /> Cc: Ms. Shelby Lathrop, ConocoPhillips Company (via electronic upload to Livelink) <br /> Larry Higinbotham, Thrifty Oil Company (via electronic mail) <br /> 5449 Site Redevelopment Status Update Letter 03-22-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.