My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
SITE INFORMATION AND CORRESPONDENCE_FILE 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 4:27:29 PM
Creation date
3/31/2020 4:12:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 3
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> June 8, 2010 <br /> Mr. Mike Infurna <br /> ConocoPhillips Site No. 5449, Former Thrifty Oil Company Station No. 172 <br /> Page 2 of 2 <br /> i <br /> petroleum hydrocarbons in groundwater samples from some wells in April 2010 (after a period of non- <br /> operation of the SVE/GWE systems)were sufficiently higher than those observed in 2008 and the first quarter <br /> 2009, further monitoring data may be required to establish representative groundwater conditions for the <br /> HHRA. A deadline and scope for the HHRA can be discussed at the August 2010 meeting, after preliminary <br /> third quarter results are available. <br /> In addition, Stantec has received communication from Best California Gas, Ltd. indicating that site <br /> redevelopment construction activities are scheduled to begin in August 2010. These activities will include <br /> demolition of the existing building and construction of a new, larger building. In order to accommodate the <br /> rebuild, the remediation compound will need to be relocated to the north, conveyance piping will need to be <br /> relocated, and well MW-4 will need to be destroyed. Stantec requests the approval of the SJCEHD to <br /> properly destroy MW-4 and evaluate the possible relocation of this well. Stantec will work with Best California <br /> Gas, Ltd. to perform the rebound testing prior to planned construction, and relocate the remediation systems <br /> as necessary. <br /> We appreciate your assistance in working with us to move this site forward. If you have any questions or <br /> comments regarding this project, please contact the undersigned at(916) 861-0400. <br /> Sincerely, <br /> STANTEC CONSULTING CORPORATION <br /> i <br /> Laura Shook <br /> Geologic Associate <br /> Diane Barclay, P.G. <br /> Principal Geologist <br /> Cc Ms. Shelby Lathrop, ConocoPhillips Company(via Livelink upload) <br /> Larry Higinbotham, Thrifty Oil Company(via email) <br />
The URL can be used to link to this page
Your browser does not support the video tag.