Laserfiche WebLink
An Addition Site Assessment Report and Groundwater Pump Test report will be forwarded to your <br /> office after The Park Corporation submits the report to Thnfty for review and approval Thrifty will <br /> make arrangements for the soil drums and the stored groundwater in the baker tank to be removed <br /> after the laboratory analytical results have been received <br />' AlI interpretations expressed in this report are based upon review of data collected by EMC Should <br /> you have any questions or require additional information, please contact either of the ed <br /> at (562) 921-3581 X376 D G <br /> Written By Reviewed By -Ll <br /> (;a; n Fri richsen Larry iginbot arri <br /> Project Manager Registered Geologist OF <br /> 4 <br />' Environmental Geologist RG #5497 <br /> 1 <br /> i <br />