Laserfiche WebLink
' 36 mg/kg Laboratory analysis of groundwater samples detected 5,500 µg/1 TPH and 830 µg/1 <br /> benzene in MW-7, and 130,000 µg/1 TPH and 7,200 µg/1 benzene in MW-8 <br /> On July 11, 1995, the three (3) vadose wells (VWA, VWB, and VWC) and three groundwater <br /> monitoring wells(MW-1, MW-2, and MW-8) were properly abandoned prior to station remodeling <br />' activities <br /> On July 25, 1995, five single-walled, steel USTs were removed from the Site and disposed of by <br />' Erickson Richmond of California Approximately 1,500 cubic yards of soil was removed from the <br /> UST excavation and transported to Forward Incorporated, of Stockton, California for disposal Nine <br /> (9)soil samples were collected beneath the five (5) USTs after excavation and seven (7) soil samples <br /> were collected at a depth of 2 to 4 feet beneath the product lines TPH and benzene was detected <br /> in soil samples collected from beneath the USTs at concentrations up to 12,000 mg/kg TPH and <br /> 33 mg/kg benzene <br /> On September 14 1995 Thrifty Oil Company contracted Alton Geoscience (Alton) to perform a <br /> vapor extraction test at the Site to assess the possibility of using this technology for soil remediation <br />' Results of the test indicated an effective radius of influence of approximately 33 feet with a flow rate <br /> pP Y <br />' of approximately 105 8 SUM and a pressure drawdown of approximately 0 10 inches of water (inches <br /> H2O), therefore, vapor extraction was identified as a feasible remediation option for the mitigation <br /> of hydrocarbon affected soil in the vadose zone beneath this site <br /> On May 28 through 30, 1996 wells VW-2, VW-4, VW-5, VW-6, MW-10/VW-1 and MW-11/VW-3 <br /> were installed onsite to depths ranging from 16 5 to 58 5 feet bgs Monitoring wells MW-10/VW-1, <br /> and MW-11/VW-3 were installed as nested wells Well VW-2 was completed as a dual-completion <br /> vadose zone monitoring well Wells VW-4, VW-5, and VW-6 were completed as triple-completion <br /> vadose zone monitoring wells Wells MW-10/VW-1 and MW-11/VW-3 were completed as dual- <br /> completion groundwater/vadose zone monitoring wells Groundwater monrtonng and sampling has <br /> occurred at the Site since June 6, 1991 Summaries of historical soil and groundwater laboratory <br /> analytical results are included as Tables 2 and 3 respectively <br />' 2.3 Physical Description <br />' 2 3 1 To o ra h <br /> The Site is located in the city of Stockton, California at an elevation of approximately 11 feet above <br /> mean sea level (MSL) The topography in the vicinity of the Site is relatively flat with a slope to the <br /> south/southeast at approximately 30 feet per mile <br /> A.11528J1 ASA 4 <br />