My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009697
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
ARCHIVED REPORTS_XR0009697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 5:10:00 PM
Creation date
3/31/2020 4:57:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009697
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Thrifty Oil Co <br /> Station # 172 <br /> 8.2 SCHEDULE <br /> This time line is for the installation and start-up of an approved remediation system Thrifty presents <br /> this tentative schedule based upon the approval of this Corrective Action Plan(CAP) Once Thrifty <br /> receives approval of this CAP,permit(s) will be requested from the San Joaquin Valley Unified Air <br /> Pollution Control District (APCD), Central Valley Regional Water Quality Control Board <br /> (CVRWQCB), and San Joaquin electrical utilities It is anticipated that the APCD permit will be <br /> obtained in approximately eight weeks, the NPDES permits will be obtained in approximately 30 <br /> weeks, and the electrical permits in approximately four weeks Acquisition and installation of the <br /> unit will take approximately four weeks subsequent to permit acquisition So once the CAP is <br /> approved the system should be operating within 34 weeks This schedule is subject to change due <br /> to unavoidable circumstances <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.