My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22700
>
2900 - Site Mitigation Program
>
PR0506618
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:16 PM
Creation date
4/1/2020 1:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506618
PE
2950
FACILITY_ID
FA0003936
FACILITY_NAME
NELSON READY MIX CONCRETE
STREET_NUMBER
22700
Direction
S
STREET_NAME
STATE ROUTE 99
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
22700 S HWY 99
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> During the week of May 9,1997; URS Greiner, Inc. completed the PSI. The scope of the PSI <br /> included the drilling of 4 soil borings on the Nelson REady-Mix site. Soil and groundwater-grab <br /> samples were collected for analysis from each of the 4 on-site soil borings. Soil and groundwater- <br /> grab samples collected from soil boring (SB-1), drilled on the west side of the former UST <br /> excavation, and from SB-2, drilled on the east side of the former UST excavation contained <br /> elevated concentrations of TPH=as-diesel. Concentrations of TPH-as-diesel in'soil were reported <br /> as high as 6,000 mg/kg at a depth of 15 feet bgs._Concentrations of TPH-as-diesel in <br /> groundwater were reported as high as 590,000 micrograms per literj( tg/l). Benzene was also <br /> detected in groundwater at a concentration of up to 3.6 pgll.. Methyl tertiary butyl ether (MTBE) <br /> was not detected in any of the soil or groundwater-grab.samples analyzed. The soil sample <br /> analytical results are summarized in Table 1 and the groundwater-grab sample analytical results <br /> are summarized in Table 2. <br /> On May 28 and 29, 1998, Wright Environmental Services, Inc. (Wright) drilled 3 soil borings for <br /> soil and groundwater-grab sampling and 3 additional soil borings for soil sampling and the <br /> installation, development, surveying and sampling of 3 monitoring wells. The well construction <br /> details and groundwater monitoring data are included in Table 3. <br /> On February 25, 1999, Wright collected soil and/or groundwater-grab samples from five additional <br /> soil borings and monitored and sampled the three existing groundwater monitoring wells. The five <br /> soil borings were drilled with a Geoprobeo direct-push rig. +The locations of the soil borings are <br /> shown on Figure 2. The methods and findings associated with these tasks will be documented in <br /> detail, upon completion of the proposed excavation and waste management activities. <br /> 3 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.