My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22700
>
2900 - Site Mitigation Program
>
PR0506618
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:16 PM
Creation date
4/1/2020 1:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506618
PE
2950
FACILITY_ID
FA0003936
FACILITY_NAME
NELSON READY MIX CONCRETE
STREET_NUMBER
22700
Direction
S
STREET_NAME
STATE ROUTE 99
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
22700 S HWY 99
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> t <br /> TABLE OF CONTENTS <br /> Technical Approach Summary............................................................................................ <br /> i <br /> 1.0 Introduction <br /> 1.1 Site Description .................................................................................... 2 <br /> 1.2 Previous Work <br /> .................................................. <br /> 2.0 Scope of Work.......................... ...........---........................................................... 5 <br /> 2.1 Project Planning ..................................................................................................... 5 <br /> 2.2 Soil and Groundwater-Grab Sampling and Analysis.............................................. 5 <br /> 2.3 Source Removal by Excavation ............................................................................. 6 <br /> 2.3.1 Excavation of Impacted Soil.................................................................... 7 <br /> 2.3.2 Excavation De-Watering ......................................................................... 7 <br /> 2.3.3 Excavation Soil Sampling and Analysis.................................................. 8 <br /> 2.3.4 Site Restoration....................................................................................... 8 <br /> a <br /> 2.3.5 Disposition of Excavated Soil.................................................................. 8 <br /> 2.4 Site investigation and Source Removal Report..................................................... 9 <br /> 2.5 Quarterly Groundwater Monitoring, Sampling, Analysis and Reporting ................ 9 <br /> 3.0 Schedule ........................................................................................................................... 11 <br /> i <br /> 1 <br /> i <br /> i <br /> v i <br /> 7 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.