My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22700
>
2900 - Site Mitigation Program
>
PR0506618
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:16 PM
Creation date
4/1/2020 1:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506618
PE
2950
FACILITY_ID
FA0003936
FACILITY_NAME
NELSON READY MIX CONCRETE
STREET_NUMBER
22700
Direction
S
STREET_NAME
STATE ROUTE 99
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
22700 S HWY 99
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> 2.4 Environmental Site Investigation Report <br /> A project report documenting all of the proposed work activities will be prepared and stamped by a <br /> state of California Registered Geologist and submitted to PHS/EHD and the Central Valley <br /> Regional Water Quality Control Board. In addition to a standard discussion of methods, the report <br /> will include the following: <br /> • Site location map and site plan; <br /> • Tables summarizing laboratory results; <br /> • Figure(s) depicting the extent of impacted soil and groundwater; <br /> • Soil boring and monitoring well logs and laboratory reports (Appendices) <br /> • Recommendations for future environmental corrective actions, if necessary. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.