Laserfiche WebLink
Winter Weather Utility Work <br /> ' I <br /> f <br /> I. SUPERVISION: The utility company(permittee) shall furnish full-time supervision <br /> of all work to insure full compliance with the permit provisions. <br /> 2. START OF WORK No work within the County right-of-way shallbestarted until the <br /> utility company representative has made an evaluation of Weather conditions and has <br /> determined the work can be accomplished under the provisions of the permit. <br /> 3. CLEAN PAVEMENT: Dirt and mud shall not be deposited on the pavement <br /> outside the area of work, and if Inadvertently_trackedonto the road travel way shall <br /> be removed immediately. <br /> 4. DAILY.RESTORATION: Private driveways and`road intersections shall be restored <br /> daily i <br /> 5. VVEA.THER_TIGHT CONDITION:• All trenches shall be filled and compacted, - p <br /> ditches an other drainage facilities regraded and opened, and-the entire work area V <br /> j restored to weather-tight condition prior to any rain. <br /> I <br /> fi <br /> � 1 <br />