My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:24 PM
Creation date
4/1/2020 1:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 February 1999 <br /> AGE-NC Project No. 98-0540 <br /> Page 4 of 8 <br /> P <br /> • Polychlorinated bi-phenols (PCBs) in accordance with EPA Method 8080; and <br /> • Halogenated volatile organic compounds(HVOCs) in accordance with EPA Method 8010. <br /> Laboratory reports for soil analyses, testing methods, laboratory quality assurance/quality control <br /> (QA/QC) reports, and sample chain of custody documentation will be presented in a report with <br /> findings and recommendations. <br /> 3.3: MONITORING WELL COMPLETION <br /> If impacted ground water is encountered, selected borings in the former UST area will be completed <br /> as two-inch diameter ground water monitoring wells. Procedures for well completion are detailed <br /> in Section 4.2. <br /> k <br /> 3.4. MONITORING WELL DEVELOPMENT AND SURVEY i <br /> Following installation, each well will be developed to maximize water flow into the well and <br /> minimize the amount of fine-grained sediment drawn into the well during pumping or bailing. <br /> Procedures for survey and well development are presented in Sections 4.2 and 4.3, respectively. } <br /> All wells at the site will be surveyed by a licensed professional relative to a County of San Joaquin <br /> benchmark to determine the elevation of each casing: <br /> 3.5. GROUND WATER SAMPLE COLLECTION AND ANALYSIS <br /> } <br /> Following the installation of the monitoring wells,one ground water monitoring and sampling event <br /> will be conducted at the site. Samples will be collected from each monitoring well and the on-site <br /> domestic well and submitted for laboratory analysis. Groundwater samples will be analyzed by a <br /> DHS-certified laboratory for the following constituents: <br /> • TPH-g in accordance with EPA Method 8015 Modified/5030; and <br /> • BTEX and MTBE.in accordance with EPA Method 602. <br /> Laboratory reports for ground water analyses,testing methods, laboratory quality assurance/quality <br /> control (QA/QC)reports, and sample chain of custody documentation will be presented in a report <br /> with the findings and recommendations. <br /> - Advanced GeoEnvimmenml,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.