12 February 1999 <br /> AGE-NC Project No. 98-0540 <br /> Page 6 of 8 <br /> Following completion of hollow-stem auger drilling activities, a PVC two-inch diameter Schedule <br /> 40, slotted well screen (0.020-inch) and well casing will be installed. <br /> The casing, filter pack and sealing materials will be placed into the borehole through the interior of <br /> the hollow-stem augers.After installing the well casing,filter pack material consisting of pre-washed <br /> #2/12 Lonestar sand will be added from the bottom of the borehole to approximately two feet above <br /> the screened interval. Following placement of the filter pack, the well will be surged to assist in <br /> settling the filter pack. Additional sand will be added if settling occurs. <br /> A nominal two foot bentonite seal will be placed above the filter pack to minimize the potential of <br /> grout penetration into the screened section of the well.The bentonite seal will be formed by pouring <br /> bentonite chips into the annulus and allowing them to settle on the filter pack. Bentonite chips will <br /> be hydrated using five gallons of water. The bentonite chips will be allowed to hydrate for a <br /> minimum of,one-half hdur prior to inserting the second well casing. <br /> The same installation procedures will apply for both the deep screened interval and the shallow <br /> screened interval. Following hydration of bentonite chips, the remaining annular space will be filled <br /> to the ground surface with a cement grout. The grout mixture will consist of Type UII portland neat <br /> cement and not more than 6 gallons of water per 94-pound sack of cement. The grout will be placed <br /> by pumping through tremmie pipe. Proposed well construction diagrams are illustrated in Figures <br /> 3 and 4. Grouting procedures will be inspected by PHS-EHD personnel. <br /> Following completion of the monitoring wells, well elevations and locations will be surveyed by a <br /> California-licensed surveyor. <br /> 4.3. WELL DEVELOPMENT <br /> Development will consist of a combination of bailing and ground water pumping to remove the <br /> major portion of fine-grained sediment from inside the well and surging to flush out or draw in <br /> sediment from the filter pack. Development activities will be continued until field parameter(pH, <br /> electrical conductivity, and temperature) readings have stabilized. <br /> 4.4. GROUNDWATER SAMPLING PROCEDURES <br /> Groundwater sample collection will be performed in accordance with pertinent applicable sampling <br /> protocols, details of which are presented below. <br /> Advanced GeoEnvironmental,Inc. <br />