My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:24 PM
Creation date
4/1/2020 1:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 February 1999 <br /> AGE-NC Project No. 98-0540 <br /> Page 8 of 8 4 <br /> from a reference point marked of the top of the PVC well casing. Before and after each use, the <br /> measurement device will be rinsed with water. <br /> 4.5. EQUIPMENT DECONTAMINATION <br /> All sampling tools used for sample collection will be thoroughly rinsed with clean water after being <br /> washed with a solution of Alconox.All down-hole drilling and sampling equipment will be pressure <br /> washed prior to starting the boring. <br /> 6 <br /> fI <br /> k <br /> II� <br /> * - Advanced Geo6nvironmental,Inc. C <br />
The URL can be used to link to this page
Your browser does not support the video tag.