Laserfiche WebLink
25,March 2005 F <br /> AGE-NC Project No 98-0540 <br />' Page 4 of 4 <br /> A Continued work to assess the vertical and lateral impact of 1,2-DCA as per the Cone <br />' Penetrometer Testing and Monitoring Well Installation Work Plan, approved by the EHD, <br /> by letter, dated 12 August 2004 The cone penetrometer testing(CPT)boring was advanced <br />' on 13 October 2004 A deadline has been set to have the two proposed monitoring wells <br /> installed by 30 April 2005 Once completed,a report will be submitted with the results of the <br /> CPT boring and monitoring well installations <br /> 6.0. LIMITATIONS <br /> Our professional services were performed using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities The findings were based upon field <br /> measurements and analytical results provided by an independent laboratory Evaluations of the <br /> hydrogeologic conditions at the site for the purpose of this investigation are made from a limited <br /> i number of available data points (i a monitoring wells, ground water samples) and subsurface <br /> conditions may vary away from these data points No other warranty,expressed or implied, is made <br /> as to the professional interpretations, opinions and recommendations contained in this report <br /> i • , <br /> i - r <br /> I - <br /> I <br /> Advanced GeoEnvironmental,Inc <br /> t <br />