Laserfiche WebLink
Project PACIFIC AM CENTER Project No -NC-98-0540 BORING NO <br /> Site Address 25355 N Highway 99, Total Depth- 89 Feet B1 <br /> LAcampo, CA Date 25 February 1999 <br /> Dnlling Co Soils Exploration Service Logged by T Mikacich Page 2 of 2 <br /> tRig/Auger Type CME-55 / 8-inch HSA Reviewed by N Henderson <br /> Lzthologic Description <br /> 75— 81-75 60 I2/43/43 ML Same as above <br /> Groundwater was encountered at 76'bsg <br /> 80— BI-80 0 13/25/26 CL Silty CLAY, light brown to gray,damp, no hydrocarbon <br /> odor <br /> 85— No sample collected @ 85' <br /> 94: Boring terminated at 89 feet bsg <br /> Completed as monitoring well MW-I <br /> Advanced <br /> GeoEnvironmental, Inc, <br /> L L4NIlPR013ORING11pA AUTQSPgCAUT01 SAW 04K}9199 9 14 AM <br />