My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2900 - Site Mitigation Program
>
PR0515318
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:54 PM
Creation date
4/1/2020 2:16:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515318
PE
2965
FACILITY_ID
FA0012087
FACILITY_NAME
FORD CONSTRUCTION CO
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
01
SITE_LOCATION
18846 N HWY 99
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK REQUEST FORM <br /> Date of Request: 6/24/99 Requested Completion Date: 6/30-31/99 <br /> Proj Name: Goeluing/Victor Meats Proj No: 99-283 <br /> Site Address: East side Hwy 99 Frontage Rd between Woodbridge Rd and <br /> Clarksdale Rd Task: <br /> Project Manager: G Stahl Field Tech: A. Scoma <br /> Client Contact: Pat Riddle Phone No: (209)367-6992 <br /> Regulatory Contact: Phone No: <br /> Approval: / Completion Date: 6/31/99 <br /> Arrive prepared to collect hand auger soil samples. Bring gloves, 36 soil tubes/cans, teflon sheeting, zip <br /> lock bags, hand auger, breaker bar, sampling trowel, shovel, stakes, hip chain, and other measuring equip., <br /> decon equip., etc. Take detailed notes and make sure all sampling locations are identified on the map and <br /> measured to a fixed point for relocation in future.Practice good QA/QC and sampling techniques. <br /> Soil samples collected will be used to determine the salinity of Pond 2. <br /> Measure the dimensions of Pond 2, and layout the pond for ten sampling locations using a standard <br /> grid method. <br /> From each sampling location collect soil samples from depths of 2 feet, 5 feet and 10 feet into brass <br /> sampling tubes. Segregate each sample by placing into its own dedicated zip lock bag and labeling <br /> appropriately. <br /> Collect background samples at depths of 2, 5, and 10 feet south of Pond 2 (Goehring) and north of <br /> Pond 2 (Douglass) at approximate locations indicated on the site map. Make sure to'decontaminate <br /> the sampling equipment between each sample collected in order to limit the possibility of cross <br /> contamination. Since the contaminant is salt you can dispose of the decon water on the ground. <br /> The samples are to be transported to A&L Analytical in Modesto, anea�alyzed fof sodium, <br /> chloride,and Total Dissolved Solids utilizing the DI STLC WET method. , <br /> Take detailed notes and make sure all sampling locations are identified on map and measured to a fixed point <br /> for possible relocation in future. <br /> Notify Project Manager prior to leaving site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.